carbon ERW seamless steel pipe for oil and gas

Tianjin Dalipu Oil Country Tubular Goods Co., Ltd

  • carbon ERW seamless steel pipe for oil and gas0
箭头游标移动至图片该处可放大
17年11月23日
US $500.00 / 公吨
1.00 公吨
L/C, D/A, T/T, D/P(CAD)
Loose package
15 天

产品详细信息

China supplier ASTM A53,API 5L round carbon ERW seamless steel pipe for oil and gas
Our products are widely used in petroleum, natural gas, gas, steam, heating and other long-distance pipelines and chemicals, electricity, water, heat, piling, construction and other industries.

Commodity
x42-x70 api5l spiral steel pipe (ssaw sawh) api 5l pipe for oil

Size
Thickness: 1.2-60mm
Lenth:1-12m
O.D:219-3048mm
Shape
Round. Or as your requirement.
Min quantity
10 tons, more quantity price
will be lower.
Technique
ERW. Welded
Special pipe
As customers
Raw Materials
Q195,Q215,Q235,Q345.as customer requirement
package
in bulk or plastic packaging, as clients demand;
Delivery time
15-20days after receiving your deposit or L/C.
Payment
TT or 100% Irrevocable LC at sight


Supply
1. Galvanized steel pipe/tube.
2. Hot dip galvanized steel pipe/tube.
3. Seamless steep pipe/tube.
4.ERW welded steel pipe/tube
5. Hot-rolled steel pipe/tube.
6. Spiral steel pipe/tube.
7. Carbon steel pipe/tube.
8. C Z U shape steel/profiles.
9. Steel coils/galvanized steel coils/sheet/strips.
Company Information
TIANJIN DALIPU OIL COUNTRY TUBULAR GOODS CO.,LTD is a modern professional industry and trade combined enterprise specializing in producing and trading seamless steel pipes.
The main products of our company are the oil casings and oil pipelines. We not only supply our goods with many large oil fields, but also establish a long-term business relationship with the Middle East Europe, Africa and other countries around the world and co-operative very well.
FAQ
Q: How long is your delivery time?
A: If there are stocks, take 5-10days to delivery for small quantity, and 30-40days for bigger quantity;If no stock, depends on the steel billet purchase,
Q: What about your payment term?
A: Usually T/T or L/C, 30% deposit and 70% before delivery.
Q: what about your standard delivery date
A: 30 days after receiving deposit .We are pleased to provide you with best services in consulting


查看更多

相关证明的文件

没有发现相关证明的文件。

公司详细资料

2017年4月20日
Tianjin Dalipu Oil Country Tubular Goods Co., Ltd is currently an emerging production and marketing enterprise based pro...
分享此页